House Introduced Concurrent Resolution
Introduced Concurrent Resolutions appear as they were introduced and reflect no subsequent amendments or changes
House Concurrent Resolution 9 of 2011
Sponsors
Categories
A concurrent resolution to urge the Federal Energy Regulatory Commission to grant a rehearing and modify its December 16, 2010 order approving the Midwest Independent Transmission System Operator's cost allocation proposal to share transmission costs.
Documents
As Adopted by the House
The As Adopted by the House version is the Concurrent Resolutions, as introduced, that includes any adopted House amendments
The As Adopted by the House version is the Concurrent Resolutions, as introduced, that includes any adopted House amendments
History
(House actions in lowercase, Senate actions in UPPERCASE)Note: A page number of 0 indicates that the page number is coming soon
Date | Journal | Action |
---|---|---|
3/15/2011 | HJ 25 Pg. 311 | introduced by Representative Amanda Price |
3/15/2011 | HJ 25 Pg. 311 | referred to Committee on Energy and Technology |
5/03/2011 | HJ 38 Pg. 567 | reported with recommendation with substitute H-1 |
5/10/2011 | HJ 41 Pg. 618 | substitute H-1 adopted |
5/10/2011 | HJ 41 Pg. 618 | adopted and transmitted |
5/11/2011 | SJ 40 Pg. 648 | RULES SUSPENDED |
5/11/2011 | SJ 40 Pg. 648 | REFERRED TO COMMITTEE ON ENERGY AND TECHNOLOGY |
6/08/2011 | SJ 51 Pg. 1438 | REPORTED FAVORABLY WITH SUBSTITUTE S-1 |
6/08/2011 | SJ 51 Pg. 1438 | PLACED ON ORDER OF RESOLUTIONS |
6/29/2011 | SJ 60 Pg. 1702 | SUBSTITUTE S-1 ADOPTED |
6/29/2011 | SJ 60 Pg. 1702 | ADOPTED AS SUBSTITUTED S-1 |
6/29/2011 | HJ 62 Pg. 1992 | returned from Senate with substitute S-1 |
6/30/2011 | HJ 63 Pg. 2003 | Senate substitute S-1 concurred in |